Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/9730
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.author | Lino, Priscila Rochinha | es-ES |
dc.contributor.author | Nobrega Barroso, Luiz Augusto | es-ES |
dc.contributor.author | Veiga Pereira, Mario | es-ES |
dc.contributor.author | Kelman, Rafael | es-ES |
dc.contributor.author | Fampa, Márcia Helena C. | es-ES |
dc.date.accessioned | 2016-06-28T03:06:14Z | - |
dc.date.available | 2016-06-28T03:06:14Z | - |
dc.date.issued | 01/04/2003 | es_ES |
dc.identifier.issn | 0254-5330 | es_ES |
dc.identifier.uri | http://hdl.handle.net/11531/9730 | - |
dc.description | Artículos en revistas | es_ES |
dc.description.abstract | es-ES | |
dc.description.abstract | The objective of this work is to investigate possible hydro-scheduling inefficiencies under a bidding scheme. It will be shown that the market-based dispatch of hydro-plants, under a perfect competitive market, converges to its least-cost dispatch. Besides, it will be shown that the usual spot payment scheme does not provide the correct incentive for upstream reservoirs to regulate downstream production, thus causing an operating distortion. The implementation of a Wholesale Water Market is proposed for trading stored water and so to correct such distortion. Case studies will be presented, with data taken from the Brazilian System. | en-GB |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | en-GB | es_ES |
dc.rights | es_ES | |
dc.rights.uri | es_ES | |
dc.source | Revista: Annals of Operations Research, Periodo: 1, Volumen: 120, Número: 1, Página inicial: 81, Página final: 97 | es_ES |
dc.title | Bid-based dispatch of hydrothermal systems in competitive markets | es_ES |
dc.type | info:eu-repo/semantics/article | es_ES |
dc.description.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.rights.accessRights | info:eu-repo/semantics/restrictedAccess | es_ES |
dc.keywords | es-ES | |
dc.keywords | bid-based dispatch, hydrothermal scheduling, stochastic optimization, power system economics, Wholesale Water Market | en-GB |
Aparece en las colecciones: | Artículos |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
IIT-03-104A.pdf | 163,95 kB | Adobe PDF | Visualizar/Abrir Request a copy |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.