Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/97804
Título : Optimal degree of smart transformer substations in distribution networks for reliability improvement
Autor : Rodríguez Calvo, Andrea
Frías Marín, Pablo
Reneses Guillén, Javier
Mateo Domingo, Carlos
Fecha de publicación : 21-feb-2013
Editorial : Sin editorial (Berlín, Alemania)
Resumen : The medium to low voltage transformer substation is a key element in the distribution system. Therefore, smart transformer substations will play a crucial role in the evolution of distribution towards the smart grid. Smart transformer substations can provide a significant improvement of continuity of supply. However, a large investment is required, so the optimal degree of automation must be determined. The main objective of this paper is to quantify the impact of smart MV/LV transformer substations on continuity of supply, which is essential to determine the optimal automation degree. The analysis has considered different degrees of implementation of smart MV/LV substations for different configuration schemes of urban distribution networks. Furthermore, sensitivity analyses have been performed for the main parameters involved so that conclusions on reliability improvement achieved by MV/LV transformer substation automation can be scaled up.
The medium to low voltage transformer substation is a key element in the distribution system. Therefore, smart transformer substations will play a crucial role in the evolution of distribution towards the smart grid. Smart transformer substations can provide a significant improvement of continuity of supply. However, a large investment is required, so the optimal degree of automation must be determined. The main objective of this paper is to quantify the impact of smart MV/LV transformer substations on continuity of supply, which is essential to determine the optimal automation degree. The analysis has considered different degrees of implementation of smart MV/LV substations for different configuration schemes of urban distribution networks. Furthermore, sensitivity analyses have been performed for the main parameters involved so that conclusions on reliability improvement achieved by MV/LV transformer substation automation can be scaled up.
Descripción : Capítulos en libros
URI : http://hdl.handle.net/11531/97804
Aparece en las colecciones: Artículos

Ficheros en este ítem:
Fichero Tamaño Formato  
IIT-12-082A.pdf467,83 kBAdobe PDFVisualizar/Abrir     Request a copy


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.