Modeling the major overhaul cost of gas-fired plants in the unit commitment problem

Thumbnail
Ver/
IIT-14-047A.pdf (1.332Mb)
Fecha
2014-05-01
Autor
Rodilla Rodríguez, Pablo
Cerisola Lopez De Haro, Santiago
Batlle López, Carlos
Estado
info:eu-repo/semantics/publishedVersion
Metadatos
Mostrar el registro completo del ítem
Mostrar METS del ítem
Ver registro en CKH

Refworks Export

Resumen
 
 
The operation and maintenance (O&M) costs of gas-turbine-based generation technologies have traditionally been introduced in unit commitment problems by means of simplified formulations (such as the approach of including an additional energy cost adder component). We argue that, in the new context characterized by the increasing need for cycling operation, such simplified approaches do not realistically reflect the impact that these new operation regimes have on the OandM costs for both open and combined cycle gas turbines. We first review the role of the so-called long-term service agreements (LTSA), which is a commonly used type of contract offered by gas-turbine manufacturers to plant owners. We analyze how these contracts implicitly determine the maintenance intervals as a function of the operating regime, and, as a consequence, determine the impact of cycling operation on OandM costs. Based on this analysis, we develop a formulation based on linear constraints that makes possible a realistic modeling of OandM costs (as defined in LTSA contracts) in the unit commitment problem. This formulation is then tested using some examples, so as to illustrate how a proper modeling of these contracts significantly changes the scheduling resulting from the traditional unit commitment problem formulation.
 
URI
https:doi.org10.1109TPWRS.2013.2293604
Modeling the major overhaul cost of gas-fired plants in the unit commitment problem
Tipo de Actividad
Artículos en revistas
ISSN
0885-8950
Materias/ categorías / ODS
Instituto de Investigación Tecnológica (IIT)
Palabras Clave

Cycling, combined cycle gas turbine (CCGT); major overhaul; operation and maintenance (O&M) cost; power generation dispatch; unit commitment
Colecciones
  • Artículos

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contacto | Sugerencias
 

 

Búsqueda semántica (CKH Explorer)


Listar

Todo DSpaceComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosMateriasPor DirectorPor tipoEsta colecciónPor fecha de publicaciónAutoresTítulosMateriasPor DirectorPor tipo

Mi cuenta

AccederRegistro

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contacto | Sugerencias