Mostrar el registro sencillo del ítem

dc.contributor.authorRodilla Rodríguez, Pabloes-ES
dc.contributor.authorCerisola Lopez De Haro, Santiagoes-ES
dc.contributor.authorBatlle López, Carloses-ES
dc.date.accessioned2016-01-15T11:15:33Z
dc.date.available2016-01-15T11:15:33Z
dc.date.issued2014-05-01es_ES
dc.identifier.issn0885-8950es_ES
dc.identifier.urihttps:doi.org10.1109TPWRS.2013.2293604es_ES
dc.descriptionArtículos en revistases_ES
dc.description.abstractes-ES
dc.description.abstractThe operation and maintenance (O&M) costs of gas-turbine-based generation technologies have traditionally been introduced in unit commitment problems by means of simplified formulations (such as the approach of including an additional energy cost adder component). We argue that, in the new context characterized by the increasing need for cycling operation, such simplified approaches do not realistically reflect the impact that these new operation regimes have on the OandM costs for both open and combined cycle gas turbines. We first review the role of the so-called long-term service agreements (LTSA), which is a commonly used type of contract offered by gas-turbine manufacturers to plant owners. We analyze how these contracts implicitly determine the maintenance intervals as a function of the operating regime, and, as a consequence, determine the impact of cycling operation on OandM costs. Based on this analysis, we develop a formulation based on linear constraints that makes possible a realistic modeling of OandM costs (as defined in LTSA contracts) in the unit commitment problem. This formulation is then tested using some examples, so as to illustrate how a proper modeling of these contracts significantly changes the scheduling resulting from the traditional unit commitment problem formulation.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceRevista: IEEE Transactions on Power Systems, Periodo: 1, Volumen: online, Número: 3, Página inicial: 1001, Página final: 1011es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleModeling the major overhaul cost of gas-fired plants in the unit commitment problemes_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsCycling, combined cycle gas turbine (CCGT); major overhaul; operation and maintenance (O&M) cost; power generation dispatch; unit commitmenten-GB


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • Artículos
    Artículos de revista, capítulos de libro y contribuciones en congresos publicadas.

Mostrar el registro sencillo del ítem