Feasibility studies of a power interconnection system for central american countries: SIEPAC Project

Thumbnail
Ver/
IIT-94-033A.pdf (381.4Kb)
Fecha
1994-06-01
Autor
Gómez San Román, Tomás
Enamorado, Juan Carlos
Vela, Ángel
Estado
info:eu-repo/semantics/publishedVersion
Metadatos
Mostrar el registro completo del ítem
Mostrar METS del ítem
Ver registro en CKH

Refworks Export

Resumen
 
 
The electrical systems of the Central American countries are linked by 230 kV ac weak border interconnections forming two separated subsystems. The first one includes Guatemala and El Salvador, and the other one comprises the systems of Honduras, Nicaragua, Costa Rica and Panamá. As a consequence, unrestricted energy exchanges among all countries are not possible. Since 1987, the following utilities have been promoting the SIEPAC project: INDE from Guatemala, CEL from EL Salvador, ENEE from Honduras, INE from Nicaragua, ICE from Costa Rica, IRHE from Panamá, together with the ENDESA Group from Spain. The SIEPAC project consists of a 1678 km long ac power transmission line that would link the six electrical systems of the region through several power substations installed close to the highest demand national centers and six control centers of energy (one for each country) to allow coordinated operation of the interconnection. This project also consideres a set of complementary assets into some countries and the border transmission line between El Salvador and Honduras, and various other equipment. The power transmission line will greately reinforce the actual border interconnections, which hace a reduced capacity of exchange and technical problems associated with the stability of a weak longitudinal system. On the other hand, economic savings for the region would be achieved, coming from a higher coordination level in the operation and planning of their systems.
 
URI
https:doi.org10.1109MPER.1994.286537
Feasibility studies of a power interconnection system for central american countries: SIEPAC Project
Tipo de Actividad
Artículos en revistas
ISSN
0272-1724
Materias/ categorías / ODS
Instituto de Investigación Tecnológica (IIT)
Palabras Clave

Planning, feasibility, international interconnections
Colecciones
  • Artículos

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contacto | Sugerencias
 

 

Búsqueda semántica (CKH Explorer)


Listar

Todo DSpaceComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosMateriasPor DirectorPor tipoEsta colecciónPor fecha de publicaciónAutoresTítulosMateriasPor DirectorPor tipo

Mi cuenta

AccederRegistro

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contacto | Sugerencias