Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/5371
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.author | Centeno Hernáez, Efraim | es-ES |
dc.contributor.author | Vitoriano Villanueva, Begoña | es-ES |
dc.contributor.author | Campos Fernández, Francisco Alberto | es-ES |
dc.contributor.author | Muñoz San Roque, Antonio | es-ES |
dc.contributor.author | Villar Collado, José | es-ES |
dc.contributor.author | Sánchez Ubeda, Eugenio Francisco | es-ES |
dc.date.accessioned | 2016-01-15T11:20:04Z | - |
dc.date.available | 2016-01-15T11:20:04Z | - |
dc.date.issued | 2003-04-01 | es_ES |
dc.identifier.issn | 0254-5330 | es_ES |
dc.identifier.uri | https:doi.org10.1023A:1023366127386 | es_ES |
dc.description | Artículos en revistas | es_ES |
dc.description.abstract | es-ES | |
dc.description.abstract | In deregulated electrical systems, production schedule for power plants is the result of an auction process. In the Spanish case, this schedule includes two main concepts: energy production (to be actually produced) and secondary reserve (to maintain available). The generation company faces the problem of converting energy schedule into a power schedule, respecting the reserve schedule as well as technical constraints, and trying to accomplish different goals: to minimise the production costs, to obtain smooth shapes for the power schedules and to optimise eventual compensation in schedules. A weighted goal mixed integer programming model with a real-size application to deal with this problem is presented. | en-GB |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | en-GB | es_ES |
dc.rights | es_ES | |
dc.rights.uri | es_ES | |
dc.source | Revista: Annals of Operations Research, Periodo: 1, Volumen: online, Número: 1-4, Página inicial: 45, Página final: 57 | es_ES |
dc.subject.other | Instituto de Investigación Tecnológica (IIT) | es_ES |
dc.title | A goal programming model for rescheduling of generation power in deregulated markets | es_ES |
dc.type | info:eu-repo/semantics/article | es_ES |
dc.description.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.rights.accessRights | info:eu-repo/semantics/restrictedAccess | es_ES |
dc.keywords | es-ES | |
dc.keywords | Electricity markets, power generation dispatch, goal programming, integer programming, short-term scheduling | en-GB |
Aparece en las colecciones: | Artículos |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
IIT-03-041A.pdf | 115,12 kB | Adobe PDF | Visualizar/Abrir Request a copy |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.