Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/5371
Título : | A goal programming model for rescheduling of generation power in deregulated markets |
Autor : | Centeno Hernáez, Efraim Vitoriano Villanueva, Begoña Campos Fernández, Francisco Alberto Muñoz San Roque, Antonio Villar Collado, José Sánchez Ubeda, Eugenio Francisco |
Fecha de publicación : | 1-abr-2003 |
Resumen : | In deregulated electrical systems, production schedule for power plants is the result of an auction process. In the Spanish case, this schedule includes two main concepts: energy production (to be actually produced) and secondary reserve (to maintain available). The generation company faces the problem of converting energy schedule into a power schedule, respecting the reserve schedule as well as technical constraints, and trying to accomplish different goals: to minimise the production costs, to obtain smooth shapes for the power schedules and to optimise eventual compensation in schedules. A weighted goal mixed integer programming model with a real-size application to deal with this problem is presented. |
Descripción : | Artículos en revistas |
URI : | https:doi.org10.1023A:1023366127386 |
ISSN : | 0254-5330 |
Aparece en las colecciones: | Artículos |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
IIT-03-041A.pdf | 115,12 kB | Adobe PDF | Visualizar/Abrir Request a copy |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.