Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/11531/5403
Título : Goal programming approach to maintenance scheduling of generating units in large scale power systems
Autor : Muñoz Moro, Lucía
Ramos Galán, Andrés
Fecha de publicación : 1-ago-1999
Resumen : This paper presents a goal programming methodology for solving maintenance scheduling of thermal generating units under economic and reliability criteria. The advantages of a multicriteria approach are demonstrated by comparing the effects that costs and reliability have on each other in power plants maintenance scheduling. The problem is formulated as a large scale mixed integer programming problem implemented in the mathematical programming language GAMS and solved using OSL. Weekly maintenance scheduling of the large scale Spanish power system for a year period illustrates the proposed methodology
This paper presents a goal programming methodology for solving maintenance scheduling of thermal generating units under economic and reliability criteria. The advantages of a multicriteria approach are demonstrated by comparing the effects that costs and reliability have on each other in power plants maintenance scheduling. The problem is formulated as a large scale mixed integer programming problem implemented in the mathematical programming language GAMS and solved using OSL. Weekly maintenance scheduling of the large scale Spanish power system for a year period illustrates the proposed methodology
Descripción : Artículos en revistas
URI : https://doi.org/10.1109/59.780915
ISSN : 0885-8950
Aparece en las colecciones: Artículos

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
IIT-99-103A.pdf682,68 kBAdobe PDFVisualizar/Abrir     Request a copy
IIT-99-103A_preview2,5 kBUnknownVisualizar/Abrir
IIT-99-103A_preview.pdf2,5 kBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.