Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/11531/5663
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.author | Moraga Ruíz de la Muela, Rocío | es-ES |
dc.contributor.author | García González, Javier | es-ES |
dc.contributor.author | Nogales Becerra, Sergio | es-ES |
dc.contributor.author | Arteseros, Montserrat | es-ES |
dc.date.accessioned | 2016-01-15T11:27:55Z | - |
dc.date.available | 2016-01-15T11:27:55Z | - |
dc.date.issued | 2007-05-21 | es_ES |
dc.identifier.uri | http://hdl.handle.net/11531/5663 | - |
dc.description | Capítulos en libros | es_ES |
dc.description.abstract | es-ES | |
dc.description.abstract | This paper proposes a methodology to determine secure operation policies of hydro systems through a contingency scenario analysis in order to prevent the risk of spillage or shortage due to inflows different to those of the nominal case. The methodology is applied within a general mid-term hydro scheduling model used to find optimal and feasible schedules of cascaded reservoirs and hydro plants. The operation criterion is to maximize the expected income of a hydro generator but minimizing the possible damaging effects of the contingency scenarios considered. In order to obtain a set of realistic scenarios which considers the seasonal and spatial correlations of inflows, the contingency scenarios are created and chosen following a pattern and clustering analysis based on the statistical analysis of historical data. An example case is presented in order to illustrate the essential features of the proposed methodology. | en-GB |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | en-GB | es_ES |
dc.publisher | Sin editorial (Estocolmo, Suecia) | es_ES |
dc.rights | es_ES | |
dc.rights.uri | es_ES | |
dc.source | Libro: 9th International Conference on Probabilistic Methods Applied to Power Systems - PMAPS 2006, Página inicial: 1-6, Página final: | es_ES |
dc.subject.other | Instituto de Investigación Tecnológica (IIT) | es_ES |
dc.title | A contingency analysis for managing the risk of water spillage or shortage in a mid-term hydro scheduling model | es_ES |
dc.type | info:eu-repo/semantics/bookPart | es_ES |
dc.description.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.rights.accessRights | info:eu-repo/semantics/restrictedAccess | es_ES |
dc.keywords | es-ES | |
dc.keywords | Hydro scheduling, flood, drought, spillage management, optimization, mid-term reservoir management | en-GB |
Aparece en las colecciones: | Artículos |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
IIT-06-052A.pdf | 1,17 MB | Adobe PDF | Visualizar/Abrir Request a copy |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.