Mostrar el registro sencillo del ítem
The worst-case wind power scenario for adaptive robust unit commitment problems
dc.contributor.author | Morales España, German Andres | es-ES |
dc.contributor.author | García González, Javier | es-ES |
dc.contributor.author | Ramos Galán, Andrés | es-ES |
dc.date.accessioned | 2016-10-18T12:05:45Z | |
dc.date.available | 2016-10-18T12:05:45Z | |
dc.identifier.uri | http://hdl.handle.net/11531/14219 | |
dc.description.abstract | es-ES | |
dc.description.abstract | This paper provides a tight description for the basic operating constraints of generating units for unit commitment (UC) problems: 1) generation limits, including 2) startup and shutdown capabilities, and 3) minimum up and down times. The Mixed-Integer Programming (MIP) formulation can be solved as a Linear Programming (LP) problem since its LP solution already provides integer solutions, hence obtaining dramatic improvements in computation time. We provide evidence of this by experimentally checking that all vertices of the feasible region are integer, and by solving a self-UC for different case studies. | en-GB |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | en-GB | es_ES |
dc.rights | es_ES | |
dc.rights.uri | es_ES | |
dc.title | The worst-case wind power scenario for adaptive robust unit commitment problems | es_ES |
dc.type | info:eu-repo/semantics/workingPaper | es_ES |
dc.description.version | info:eu-repo/semantics/draft | es_ES |
dc.rights.accessRights | info:eu-repo/semantics/restrictedAccess | es_ES |
dc.keywords | es-ES | |
dc.keywords | Unit Commitment (UC), Mixed-Integer Programming (MIP), Tight Formulation, Convex Hull. | en-GB |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Documentos de Trabajo
WorkingPaper, ponencias invitadas y contribuciones en congresos no publicadas