Mostrar el registro sencillo del ítem
Assessment of operation reserves in hydrothermal electric systems with high wind generation
dc.contributor.author | Ramos Galán, Andrés | es-ES |
dc.contributor.author | Rivier Abbad, Michel Luis | es-ES |
dc.contributor.author | García González, Javier | es-ES |
dc.contributor.author | Latorre Canteli, Jesús María | es-ES |
dc.contributor.author | Morales España, German Andres | es-ES |
dc.date.accessioned | 2016-10-18T12:06:29Z | |
dc.date.available | 2016-10-18T12:06:29Z | |
dc.identifier.uri | http://hdl.handle.net/11531/14282 | |
dc.description.abstract | es-ES | |
dc.description.abstract | In this paper, we propose a method to analyze the amount of operation reserves procured in a system based on two stages. The first stage is a detailed hourly unit commitment and the second stage is a simulation model with a shorter time period. The method is applied to the Spanish hydrothermal system and several cases are analyzed to determine the impact of the time period in the use of the operation reserves. | en-GB |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | en-GB | es_ES |
dc.rights | es_ES | |
dc.rights.uri | es_ES | |
dc.title | Assessment of operation reserves in hydrothermal electric systems with high wind generation | es_ES |
dc.type | info:eu-repo/semantics/workingPaper | es_ES |
dc.description.version | info:eu-repo/semantics/draft | es_ES |
dc.rights.accessRights | info:eu-repo/semantics/restrictedAccess | es_ES |
dc.keywords | es-ES | |
dc.keywords | Mixed-integer programming, operating reserves, unit commitment, economic dispatch, wind power uncertainty. | en-GB |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Documentos de Trabajo
WorkingPaper, ponencias invitadas y contribuciones en congresos no publicadas