Mostrar el registro sencillo del ítem

dc.contributor.authorWogrin, Sonjaes-ES
dc.contributor.authorGalbally, Davides-ES
dc.contributor.authorRamos Galán, Andréses-ES
dc.date.accessioned2017-05-05T09:58:59Z
dc.date.available2017-05-05T09:58:59Z
dc.identifier.urihttp://hdl.handle.net/11531/18257
dc.description.abstractes-ES
dc.description.abstractCombined cycle gas turbine power plants (CCGTs) play a key role in modern electric power systems due to their operational flexibility and the firmness they provide to the networks where they operate. Due in part to this flexibility and firmness, the function of CCGTs has experienced a significant evolution with the advent of intermittent renewable energy sources such as wind: CCGTs are increasingly required to rapidly vary load levels in order to counterbalance the fluctuations of renewable energy sources and satisfy overall system demand. In this paper we present a case study that shows that neglecting fatigue cycling costs when making operational decisions generates suboptimal cost and profit outcomes for CCGT operators. Furthermore, it is shown that profitability of CCGTs is compromised in systems with very significant penetration of intermittent renewable energy sources, due to the increase in cycling costs derived from continuous load-following operation.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.titleImpact of fatigue cycling costs on CCGT operationses_ES
dc.typeinfo:eu-repo/semantics/workingPaperes_ES
dc.description.versioninfo:eu-repo/semantics/draftes_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsen-GB


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem