Mostrar el registro sencillo del ítem

dc.contributor.authorSigrist, Lukases-ES
dc.contributor.authorRouco Rodríguez, Luises-ES
dc.contributor.authorJiménez Serrano, Claraes-ES
dc.date.accessioned2019-05-23T03:11:50Z
dc.date.available2019-05-23T03:11:50Z
dc.identifier.urihttp://hdl.handle.net/11531/36855
dc.description.abstractes-ES
dc.description.abstractThis paper presents a method to size battery energy storage systems (BESSs) to minimize underfrequency load shedding in island power systems. The proposed method depends on a simplified representation of the power system, where generating units are represented by firstorder systems. An analytical expression is derived to estimate the BESS size. The proposed method has been applied to two Spanish isolated power systems. Dynamic simulations with PSSE software package confirm the proposed method to size BESS. BESS with a capacity around 6 to 9 of the installed generation capacity are needed to avoid load shedding.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.titleSizing of a battery energy storage system to minimize underfrecuency load shedding in island power systemses_ES
dc.typeinfo:eu-repo/semantics/workingPaperes_ES
dc.description.versioninfo:eu-repo/semantics/draftes_ES
dc.rights.holderes_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordses-ES
dc.keywordsen-GB


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem