• English
    • español
  • español 
    • English
    • español
  • Login
Ver ítem 
  •   DSpace Principal
  • 2.- Investigación
  • Documentos de Trabajo
  • Ver ítem
  •   DSpace Principal
  • 2.- Investigación
  • Documentos de Trabajo
  • Ver ítem
JavaScript is disabled for your browser. Some features of this site may not work without it.

Minimum-cost-based electricity generation capacity planning: does annualized investment cost always yield full cost recovery with marginal pricing?

Thumbnail
Ver/
IIT-21-213WP.pdf (709.6Kb)
Autor
Centeno Hernáez, Efraim
Campos Fernández, Francisco Alberto
Maguregui, Javier
Wogrin, Sonja
Estado
info:eu-repo/semantics/draft
Metadatos
Mostrar el registro completo del ítem
Mostrar METS del ítem
Ver registro en CKH

Refworks Export

Resumen
 
 
This papers presents some advances in answering the question of cost recovery of investments for the optimal technological mix in electricity systems.
 
URI
http://hdl.handle.net/11531/64320
Minimum-cost-based electricity generation capacity planning: does annualized investment cost always yield full cost recovery with marginal pricing?
Palabras Clave

Electricity Generation Capacity Planning, Electricity Market, Cost-Recovery, Marginalist Theory
Colecciones
  • Documentos de Trabajo

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contacto | Sugerencias
 

 

Búsqueda semántica (CKH Explorer)


Listar

Todo DSpaceComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosMateriasPor DirectorPor tipoEsta colecciónPor fecha de publicaciónAutoresTítulosMateriasPor DirectorPor tipo

Mi cuenta

AccederRegistro

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contacto | Sugerencias