• English
    • español
  • español 
    • English
    • español
  • Login
Ver ítem 
  •   DSpace Principal
  • 2.- Investigación
  • Documentos de Trabajo
  • Ver ítem
  •   DSpace Principal
  • 2.- Investigación
  • Documentos de Trabajo
  • Ver ítem
JavaScript is disabled for your browser. Some features of this site may not work without it.

Multistage distribution expansion planning leveraging load flexibility

Thumbnail
Ver/
IIT-23-358WP.pdf (2.756Mb)
Autor
Ulrich Ziegler, David
Mateo Domingo, Carlos
Gómez San Román, Tomás
Prettico, Giuseppe
Estado
info:eu-repo/semantics/draft
Metadatos
Mostrar el registro completo del ítem
Mostrar METS del ítem
Ver registro en CKH

Refworks Export

Resumen
 
 
This paper presents the multistage distribution network planning problem, utilizing conventional and non-conventional expansion measures. Here, conventional network expansions, i.e. transformers and lines installations, compete with load flexibility contracting. The proposed multistage planning methodology aims at minimizing the net present value of all investment and operational costs, while annuity calculations are used to make technologies with different characteristics comparable. A novel combination of the pseudo-dynamic planning approach called forward fill-in with a single-stage planning approach that utilizes load flexibility is developed. The single-stage distribution network planning model is based on the Tabu Search metaheuristic, which has proven to be scalable for realistic large-scale networks. In a case study, the multistage model is applied to a two-stage planning problem.The results show clearly that the proposed multistage methodology is useful for planning studies. In contrast to single-stage methodologies, the multistage methodology not only allows to account for the time value of money, allowing to analyze savings due to network investment deferrals. But it also allows to demonstrate the value of flexibility contracting in distribution network planning. In the case study, flexibility contracting at a cost of 10 €kW per year results in total cost savings of 15.68 .
 
URI
http://hdl.handle.net/11531/87221
Multistage distribution expansion planning leveraging load flexibility
Palabras Clave

multistage, distribution system, expansion planning, flexibility, realistic network
Colecciones
  • Documentos de Trabajo

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contacto | Sugerencias
 

 

Búsqueda semántica (CKH Explorer)


Listar

Todo DSpaceComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosMateriasPor DirectorPor tipoEsta colecciónPor fecha de publicaciónAutoresTítulosMateriasPor DirectorPor tipo

Mi cuenta

AccederRegistro

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contacto | Sugerencias