• English
    • español
  • English 
    • English
    • español
  • Login
View Item 
  •   Home
  • 2.- Investigación
  • Documentos de Trabajo
  • View Item
  •   Home
  • 2.- Investigación
  • Documentos de Trabajo
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Minimum-cost-based capacity planning: does annualized capital expenditure always yield full cost recovery with marginal pricing? (extended version)

Thumbnail
View/Open
IIT-23-006WP.pdf (1.025Mb)
Author
Centeno Hernáez, Efraim
Campos Fernández, Francisco Alberto
Maguregui, Javier
Fernández Palomino, Luis Jesús
Wogrin, Sonja
Estado
info:eu-repo/semantics/draft
Metadata
Show full item record
Mostrar METS del ítem
Ver registro en CKH

Refworks Export

Abstract
 
 
This paper compares three ways of dealing with the annualization of investment cost (CapEx) when analyzing minimum-cost capacity expansion planning. The first is the classic single-year annualized cost representation, while the other two extend the study to several years with different CapEx representations. Overall versus annualized cost representation shows some advantages as it does not require fixing a criterion for investment cost annualization. It also provides a coherent definition of long-run cost (or prices) when assuming infinite life companies by modeling residual values. Moreover, overall representation adequately represents the life span of production assets. However, the cost recovery property in marginal pricing, which always holds for annualized cost representation under some reasonable hypothesis, is not satisfied for overall cost representations in some situations. In this paper, the conditions that must be fulfilled to get full cost recovery are analyzed in detail, showing a connection between cost recovery and the presence of investments in the last year of the studied horizon. The problem is analyzed in the framework of electricity generation, but conclusions can be extended to other equivalent production contexts.
 
URI
http://hdl.handle.net/11531/87229
Minimum-cost-based capacity planning: does annualized capital expenditure always yield full cost recovery with marginal pricing? (extended version)
Palabras Clave

Electricity Generation Capacity Planning, Electricity Market, Cost-Recovery, Marginalist Theory
Collections
  • Documentos de Trabajo

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contact Us | Send Feedback
 

 

Búsqueda semántica (CKH Explorer)


Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsxmlui.ArtifactBrowser.Navigation.browse_advisorxmlui.ArtifactBrowser.Navigation.browse_typeThis CollectionBy Issue DateAuthorsTitlesSubjectsxmlui.ArtifactBrowser.Navigation.browse_advisorxmlui.ArtifactBrowser.Navigation.browse_type

My Account

LoginRegister

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contact Us | Send Feedback